1.用干水泥直接进行施工,采用这种工作方式时需要提前将干水泥撒布在准备修复的旧沥青路面上,水泥的撒布量需要利用试验得出:然后冷再生机行铣刨,在拌和腔内加入水使铣刨下来的旧材料与水泥充分地拌和,然后从出料口出料:用压路机进行路面的压实。
1. Construction is carried out directly with dry cement. When using this method of work, the dry cement needs to be spread on the old asphalt road surface that is ready for repair in advance. The amount of cement spread needs to be determined through experiments. Then, a cold recycling machine is used for milling, and water is added to the mixing chamber to fully mix the milled old material with cement. Finally, the material is discharged from the discharge port. Finally, a road roller is used to compact the road surface.
2.采用水泥稀浆为介质进行施工,采用这种工作方式时,需要一款冷再生机的配套设备--水泥稀浆车。施工步骤如下:先将水泥稀浆车和冷再生机进行刚性连接,并将水泥稀浆车的水泥稀浆输出口和冷再生机的输入口进行管路连接:然后直接用冷再生机在旧路面进行铣刨,将铣刨下来的废旧材料送到拌和腔内,然后通过拌和腔内的喷洒梁喷入水泥稀浆,让水泥稀浆和铣刨下来的废旧材料进行充分抖和,然后从出料口出料:用路机进行路面的势。
2. When using cement slurry as the medium for construction, a supporting equipment for a cold recycling machine - cement slurry truck is required. The construction steps are as follows: first, rigidly connect the cement slurry truck and the cold recycling machine, and connect the cement slurry output port of the cement slurry truck and the input port of the cold recycling machine through a pipeline. Then, directly use the cold recycling machine to mill the old road surface, and send the milled waste materials to the mixing chamber. Then, spray the cement slurry into the mixing chamber through the spray beam in the mixing chamber, allowing the cement slurry and milled waste materials to shake and mix thoroughly. Finally, discharge from the discharge port. Finally, use the road machine to adjust the road surface.
3.采用喷洒乳化沥青为介质进行施工。采用这种工作方式时,需要提前配好乳化沥青,再将装有乳化沥青的沥青车与冷再生机进行管路连接:然后冷再生机开始铣刨将铣刨下来的废旧材料传送到拌和腔内。与喷入的乳化沥青和水进行充分拌和,然后从出料口出料;用压路机进行路面的压实
3. Use sprayed emulsified asphalt as the medium for construction. When using this working method, it is necessary to prepare emulsified asphalt in advance, and then connect the asphalt truck containing emulsified asphalt to the cold recycling machine through pipelines. Then, the cold recycling machine starts milling and transferring the milled waste materials to the mixing chamber. Mix thoroughly with the sprayed emulsified asphalt and water, and then discharge from the discharge outlet; Finally, use a roller to compact the road surface
4.采用泡沫沥青作为介质进行施工,这种工作方式时在前期的试验上比较繁琐,需要通过试验来获取定的膨胀比和半衰期,采用泡沫沥青作为介质进行施工时,冷再生机前方需要接有1台热沥青车和1台水车:在冷再生机铣刨下来的废旧料传送到拌和脖内的同时,热沥青和水在冷再生机的发泡腔内已经完成发泡并同时被传送到拌和腔,泡沫沥青将材料中的细料覆盖并形成一种灰浆,再由这种灰浆将粗颗粒材料有效地黏结在一起,然后从出料口出
4. Using foam asphalt as the medium for construction is tedious in the early stage of the test, and the constant expansion ratio and half-life need to be obtained through the test. When using foam asphalt as the medium for construction, a hot asphalt truck and a water truck need to be connected in front of the cold recycling machine: while the waste materials milled by the cold recycling machine are transferred to the mixing neck, the hot asphalt and water have completed foaming in the foaming cavity of the cold recycling machine and are transferred to the mixing cavity at the same time. The foam asphalt first covers the fine materials in the materials and forms a mortar, and then the mortar effectively binds the coarse grained materials together, and then Exit from discharge port
料;用压路机进行路面的压实该种工作方式可以在修补沥青下面层和基层时使用,这种方法能将半刚性基层转换为半柔性基层其养护时间短,施工工期短,对交通影响小。
Material; Finally, using a roller to compact the road surface can be used in repairing the asphalt subgrade and base layer. This method can convert a semi-rigid base layer into a semi flexible base layer, with short maintenance time, short construction period, and minimal impact on traffic.