1、冷再生机制作成本低。根据国外的施工资料介绍,与在旧铺层上加铺新料的方法相比,就地冷再生约可降低成本20%~46%。
1. The production cost of the cold regenerator is low. According to the introduction of foreign construction data, compared with the method of paving new materials on the old pavement, the in-situ cold regeneration can reduce the cost by about 20%~46%.
2、提高旧路等级。可以通过基层承载力的提高从根本上实现道路等级的提高,这对低等级公路尤其有特殊意义。
2. Improve the grade of old roads. The road grade can be improved fundamentally through the improvement of base bearing capacity, which is of special significance for low-grade highways.
3、结构的完整性。冷再生施工产生的均匀的较厚铺层内,不存在传统施工方法中有时出现的较薄铺层间的薄弱界面。
3. Structural integrity. There is no weak interface between thinner pavements that sometimes appears in traditional construction methods in the even thicker pavements produced by cold regeneration construction.
4、不损坏路基。由于冷再生施工为一次性作业方式,再生机组在暴露的路基上只通过一次。所以与传统施工方法相比,对路基的损害较小。
4. Do not damage the subgrade. Since the cold regeneration construction is a one-time operation, the regeneration unit passes through the exposed subgrade only once. Therefore, compared with the traditional construction method, the damage to the subgrade is small.
www.tclqgc.com
5、节约材料。所有旧铺层材料全部就地利用,从而大大减少了新材料的用量,保护了资源。
5. Save materials. All old paving materials are used locally, which greatly reduces the consumption of new materials and protects resources.
6、工期短。由于不存在旧料的运输问题,不需要其他机械对旧料的靶松和破碎,不需要大块材料的去除和专门破碎,更重要的是施工过程的一次性作业特点大大简化了施工程序,从而节约了施工时间。
6. Short construction period. As there is no transportation problem of old materials, there is no need for other machinery to loosen and crush the old materials, and there is no need for the removal and special crushing of large materials. More importantly, the one-time operation characteristics of the construction process greatly simplify the construction procedure, thus saving the construction time.
7、冷再生机租赁人员认为能保护环境。因为旧料的利用大大减少了新材料的开采量,也不存在旧料的运输和堆放问题。从根本上满足了环境保护的要求。
7. The leasing personnel of the cold regeneration machine think it can protect the environment. Because the utilization of old materials greatly reduces the mining volume of new materials, there is no problem of transportation and stacking of old materials. It fundamentally meets the requirements of environmental protection.
想了解更多冷再生机相关信息,可以关注我们网站www.tclqgc.com咨询相关咨询!
For more information about the cold regenerator, please follow our website at www.tclqgc Com consulting related consulting!

阅读/ Recommended reading

  1.1材料准备  1.1 Material Preparation  在实际的道路基层冷再生施工作业过程中,主要用到的施工材料有沥青面层铣刨料、水泥和水等等。通常大部分施工单...

冷再生在施工中常见的问题有哪些? 2024-11-06
冷再生机租赁:冷再生和热再生的区别是什么? 2024-11-01
泡沫沥青冷再生技术施工前的准备 2024-10-26
冷再生机租赁:路拌/冷再生机,让你的施工过程始终“开挂” 2024-10-14

产品/ Recommended products