冷再生施工和机械租赁业务
筑路架桥,奉献社会;以人为本,不断创新

服务热线

18264104888

新闻中心

首页>>新闻中心冷再生施工各方面的准备工作

冷再生施工各方面的准备工作

来源:http://www.tclqgc.com/ 日期:2022-08-24 发布人:
不管什么施工都建议是在之前做好相应的准备工作,一方面是为了更好的去提高工作质量加快工作进度,二来是为了保障人员的。下面冷再生机租赁厂家讲讲冷再生施工各方面的准备工作。
No matter what construction, it is recommended to make corresponding preparations before construction. On the one hand, it is to better improve the work quality and speed up the work progress, and on the other hand, it is to ensure the safety of personnel. Next, the rental manufacturer of the cold regeneration machine will talk about the preparation work in all aspects of the cold regeneration construction.
场地准备
Site preparation
(1)直接填筑的路基基底,施工前必需经过检查签证;需求停止地基处置的基底必需完成各项处置,并满足地基处置的请求。
(1) The subgrade base directly filled must be inspected and signed before construction; The foundation that needs to stop foundation treatment must complete various treatments and meet the requirements of foundation treatment.
(2)场地应该保证足够的平整度,满足设备、人员进场请求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好场地的暂时排水和防雨措施。依照施工运量和施工机械的大荷载建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the large load of construction traffic and construction machinery.
技术准备
Technical preparation
做好相关人员的技术培训和技术交底工作,使参与施工的全体人员充沛认识高速铁路路基填筑的关键技术、质量控制要点。
The technical training and technical disclosure of relevant personnel shall be carried out to make all personnel involved in the construction fully understand the key technologies and quality control points of high-speed railway subgrade filling.
冷再生机租赁
平安控制要点
Safety control points
1、施工区域应设警示标志,严禁非工作人员出入。
1. Warning signs shall be set in the construction area, and non staff are strictly prohibited from entering and leaving.
2、施工中应对机械设备停止定期检查、养护、维修。
2. Regular inspection, maintenance and repair of mechanical equipment shall be stopped during construction.
3、为保证施工平安,现场应有专人统一指挥,并设一名专职平安员担任现场的平安工作,坚持班行进行平安教育制度。
3. In order to ensure the safety of construction, the site shall be under the unified command of a special person, and a full-time safety officer shall be appointed to take charge of the safety work on the site, and the safety education system shall be adhered to.
4、改进土施工中,现场设专人指挥、调度,肯定适宜的机械车辆走行道路,并设立明显标志,避免互相干扰碰撞,机械作业要留有平安间隔。制定作业程序和运转道路,确保谐和施工,平安消费。
4. During the construction of improved soil, special personnel shall be assigned to direct and dispatch the construction site to confirm the appropriate road for mechanical vehicles and set up obvious signs to avoid mutual interference and collision. Safe intervals shall be reserved for mechanical operations. Formulate operation procedures and operation roads to ensure harmonious construction and safe consumption.
冷再生施工各方面的准备工作的相关内容就讲解到这里了,您对此有什么疑问可关注我们网站http://www.tclqgc.com直接来咨询。
That's all about the preparations for cold recycling construction. If you have any questions, please follow our website http://www.tclqgc.com Come directly to consult.

阅读/ Recommended reading

  冷再生机和路拌机在路面施工及维修中各有其独特的功能和适用场景,它们之间的主要区别体现在以下几个方面:  Cold recycling machines and road mi...

冷再生机出租对道路施工行业的影响 2024-12-18
如何选择冷再生机出租服务 2024-12-16
冷再生机出租:道路施工的新选择 2024-12-11
冷再生机租赁在土壤稳定中的应用与优势 2024-12-09

产品/ Recommended products