为什么需要利用冷再生施工?究竟冷再生机租赁公司租赁的冷再生设备能具有多大的作用?它的施工速率如何?成本增加不高?接下来让小编给各位解释关于冷再生施工的几个优点。
Why is it necessary to use cold recycling for construction? How important is the cold recycling equipment leased by the cold recycling machine leasing company? What is the construction rate? Cost increase is not high? Next, let me explain to you some advantages of cold recycling construction.
1.低成本
1. Low cost
道路就地冷再生机因为所有利用了旧的路面起模原材料,进而降低了道路检修或更新改造时旧起模原材料的基坑开挖、运送、废置和新型材料的购买,进而造成成本费大幅降低。
The road in place cold recycling machine uses all the raw materials for the old pavement formwork lifting, thus reducing the excavation, transportation, waste and purchase of new materials of the old formwork lifting raw materials during the road maintenance or renovation, thus resulting in a significant reduction in costs.
选用道路就地冷再生比传统式方法对比,伴随着再生层薄厚的不一样,能够控制成本,冷再生路面薄厚越厚,控制成本越多。
Compared with the traditional method, the in situ cold recycling of roads can control the cost due to the difference in the thickness of the recycling layer. The thicker the cold recycling pavement is, the more the cost will be controlled.
在路面农村基层因其原料的再利用可节约很多项目投资,在低级别路面中,因用冷再生加工工艺可提升路面农村基层级别而减少整体面层的资金投入,这类客观性具体优势的存有是促使就地冷再生技术性遭受认可而且获得迅速发展趋势的原始动力。
The recycling of raw materials can save a lot of project investment in rural pavement base course. In low-grade pavement, the use of cold recycling processing technology can improve the level of rural pavement base course and reduce the investment in the overall surface course. The existence of such objective specific advantages is the original power to promote the recognition of on-site cold recycling technology and obtain rapid development trend.
2.效率高
2. High efficiency
道路就地冷再生机械设备施工一次性能够进行沥青道路、粉碎、加上、搅拌及铺筑,进而简单化了施工程序流程,减少施工施工期。应用就地冷再生机械设备,每日施工可进行平米的劳动量。
The construction of on-site cold recycling mechanical equipment can conduct asphalt road, crushing, adding, mixing and paving at one time, thereby simplifying the construction process and reducing the construction period. With the use of on-site cold recycling mechanical equipment, the daily construction can carry out square meters of labor.
3.受气温标准危害小
3. Less harmed by temperature standards
旧地冷再生可以在气温自然环境不确定性的标准下施工,除开在降水量很大时,一般的变幻无常的气温,毛毛雨气温,冷再生机均可施工,即便在暴雨之后,也可立刻修复施工。
Cold regeneration of old land can be carried out under the standard of uncertainty of temperature and natural environment. Except when the precipitation is large, the general changeable temperature, drizzle temperature and cold regeneration machine can be constructed. Even after the rainstorm, the construction can be repaired immediately.
4.对城市公共交通危害明显降低
4. Significantly reduce the harm to urban public transport
冷再生租用施工的特性是冷再生工艺流程简洁明了,施工设备少,对交通出行影响体现不比较敏感全部冷再生机械设备组成能够处在同一条行车道内,不危害另一条行车道机动车行驶,可开展敞开式施工,非常适用车流量很大或路宽窄小状况下的道路的施工。
The characteristics of cold recycling rental construction are that the cold recycling process is simple and clear, the construction equipment is few, and the impact on traffic is not sensitive. All cold recycling mechanical equipment components can be located in the same lane, and do not endanger the driving of motor vehicles in another lane. Open construction can be carried out, which is very suitable for the construction of roads with large traffic flow or narrow road width.
当道路半幅施工时,另半幅仍旧启用,进而大大的改进施工情况下的交通条件。因而,做为一种效率高、、环境保护道路检修方式和新技术新工艺,路面冷再生机早已变成国际性上道路更新改造的关键方式之一。
When half of the road is constructed, the other half is still in use, thus greatly improving the traffic conditions under construction. Therefore, as a high efficiency, environmental protection and energy conservation, environmental protection road maintenance mode and new technology and new process, road cold recycling machine has already become one of the key ways of road renewal and reconstruction internationally.
就地冷再生施工能够依据不一样道路旧起模原材料的具体情况开展设计方案,挑选不一样的防腐剂,能够确保再生原材料的品格和施工品质,产生施工成形厚而匀称的粘接层,进而确保了检修后道路的应用限期。您有什么需求可以来我们网站http://www.tclqgc.com进行咨询!
The on-site cold recycling construction can carry out the design scheme according to the specific conditions of the old mold lifting raw materials of different roads, select different preservatives, ensure the quality and construction quality of the recycled raw materials, generate thick and symmetrical bonding layer for construction, and thus ensure the application deadline of the roads after maintenance. If you have any needs, you can come to our website http://www.tclqgc.com Consult!
下一篇:冷再生机租赁选择以及维护问题 上一篇:道路上使用冷再生机有哪些优点
阅读/ Recommended reading
- 冷再生机出租对道路施工行业的影响 2024-12-18
- 如何选择冷再生机出租服务 2024-12-16
- 冷再生机出租:道路施工的新选择 2024-12-11
- 冷再生机租赁在土壤稳定中的应用与优势 2024-12-09
冷再生机和路拌机区别
[2018-08-23]
冷再生机和路拌机在路面施工及维修中各有其独特的功能和适用场景,它们之间的主要区别体现在以下几个方面: Cold recycling machines and road mi...