新闻中心
新闻资讯
联系我们
山东途畅路桥工程有限公司
联系人:石总
电话:18264104888
地址:山东省济南市槐荫区经一路273号群盛华城
路面冷再生机的组成和工作原理
来源:http://www.tclqgc.com/ 日期:2021-08-04 发布人:
一般来说,长期经受重型交通的路面会出现路基损坏的情况。为了这种损坏,需要对整个路面进行结构性维修。路面冷再生机将铣刨料全部进行重新利用,加之其经济的处理方式,使得采用泡沫沥青进行冷再生施工成为一种开创性解决方案,达到而经济的作用。
Generally speaking, the pavement subject to heavy traffic for a long time will have subgrade damage. In order to eliminate this damage, the whole pavement needs to be structurally repaired. The road cold recycling machine reuses all the milling materials, and its economic treatment mode makes the cold recycling construction of foamed asphalt become a pioneering solution to achieve the environmental protection and economic role.
组成:路面冷再生机是沥青路面冷再生施工中的主要设备,一般由动力系统、传动系统、工作装置、喷洒系统和操纵控制系统组成。
Composition: pavement cold recycling machine is the main equipment in asphalt pavement cold recycling construction. It is generally composed of power system, transmission system, working device, spraying system and operation control system.
工作原理:路面冷再生机向前行进时,转子向上旋转铣刨原路面材料,同时,水通过软管从路面冷再生机连接的水车中输送过来,并在路面冷再生机的拌和仓中喷洒。水的输送量通过微处理器控制的泵送系统准确控制,以达到需要的含水量。
Working principle: when the pavement cold regenerator moves forward, the rotor rotates upward to mill the raw pavement materials. At the same time, the water is transported from the water truck connected to the pavement cold regenerator through the hose and sprayed in the mixing bin of the pavement cold regenerator. The delivery volume of water is accurately controlled by the microprocessor-controlled pumping system to achieve the required water content.
铣刨转子将水与铣刨料充分拌和。液体稳定剂,例如热沥青(冷再生机自带泡沫沥青发泡装置,可将热沥青加热到160-180°C,与少量水混合发泡)可通过专门设计的喷洒嘴被喷洒到拌和腔;粉状稳定剂如水泥需按设计添加量事先洒布在路面冷再生机前的路面上,路面冷再生机将粉状稳定剂与再生料和水一次性拌和。如遇再生层原级配不好的情况,可在再生前将所缺少的部分集料洒布在路面上,通过与旧料拌和来改善原路面材料的级配。
The milling rotor shall fully mix the water with the milling material. Liquid stabilizer, such as hot asphalt (cold recycling machine with foam asphalt foaming device, can heat asphalt to 160-180 degrees C, mixing with a small amount of water) can be sprayed to the mixing chamber through a specially designed spray nozzle. Powdery stabilizer such as cement shall be sprinkled on the pavement in front of the pavement cold regenerator according to the designed addition amount, and the pavement cold regenerator shall mix the powdery stabilizer with recycled material and water at one time. If the original gradation of the recycled layer is not good, the missing part of the aggregate can be sprinkled on the pavement before regeneration, and the gradation of the original pavement materials can be improved by mixing with the old materials.
下一篇:冷再生机的常用施工方案介绍! 上一篇:冷再生机是解决道路全深度翻新的平台
阅读/ Recommended reading
- 如何选择冷再生机出租服务 2024-12-16
- 冷再生机出租:道路施工的新选择 2024-12-11
- 冷再生机租赁在土壤稳定中的应用与优势 2024-12-09
- 全深式就地冷再生施工中的机械设施设备应用 2024-12-05
冷再生机出租对道路施工行业的影响
[2018-08-23]
施工项目中,选择合适的冷再生机出租服务对于保证工程质量和进度关重要。本文将提供一些关键因素,帮助施工单位做出明智的选择。Choosing the appropriate ren...