冷再生泡沫沥青冷再生机出租施工的技术有哪些?
来源:http://www.tclqgc.com/ 日期:2021-09-07 发布人:
沥青冷再生技术,其实就是将泡沫沥青的一些优良性能应用于实际应用的技术。与传统工艺相比,在实际应用中效果较好。但是,用户要想充分发挥技术优势,在实际施工过程中需要遵循以下流程:
The cold recycling technology of asphalt is actually a technology that applies some good properties of foamed asphalt to practical application. Compared with the traditional process, the effect is better in practical application. However, in the actual construction process, users need to follow the following technical advantages:
在施工过程中,冷再生租赁过来以后,需要用铣刨机将要进行铺设的沥青面层清洗干净。需要大修的路面要磨平到基层。废料可由装车车重新装车回用,然后铺设泡沫沥青混凝土。需要注意的是,这些冷再生技术在铺筑新路面过程中不受天气条件的限制,即使在寒冷的天气和雨天,仍能进行施工。单从这点就可以看出,它在当今市场上的应用非常广泛。
In the construction process, after the cold recycling lease, the asphalt surface course to be paved shall be cleaned with a milling machine. The pavement to be overhauled shall be ground to the base. The waste can be reloaded by the loading car, and then the foamed asphalt concrete will be laid. It should be noted that these cold recycling technologies are not limited by the weather conditions in the process of paving new pavement, even in cold weather and rainy days, construction can still be carried out. From this point we can see that it is widely used in today's market.
以上是泡沫沥青在施工过程中的冷再生工艺流程。只要用户按照上述工艺进行路面摊铺,那么它的效果必然就是有保证的。
The above is the cold recycling process of foamed asphalt in construction. As long as the user carries on the pavement paving according to the above technology, then its effect must be guaranteed.
在实施一个项目时,需要进行质量控制,以确保效果。那么,如何控制冷再生的质量呢?为保证冷再生租赁的质量控制,应遵循以下三点:
In the implementation of a project, quality control is needed to ensure the effect. Then, how to control the quality of cold regeneration? In order to ensure the quality control of cold regeneration leasing, the following three points should be followed:
1、原材料的各项试验要在施工前进行,检验合格后方可使用。施工前应对混合料进行各种试验,确认材料无变化后方可施工。
1. All tests of raw materials should be carried out before construction and can be used only after passing the inspection. Before construction, all kinds of tests should be carried out on the mixture, and the construction can be carried out after confirming that the materials have no change.
2、施工过程中,应随时检测混合料中粘结剂和外加剂的含量,确保施工质量。
2. During the construction process, the content of binder and admixture in the mixture should be detected at any time to ensure the construction quality.
3、在施工过程中,应根据混合料的拌和性和可加工性及时调整耗水量。
3. In the construction process, the water consumption should be adjusted timely according to the mixing and processability of the mixture.
以上是关于冷再生泡沫沥青冷再生机施工的技术的介绍,希望对大家有所帮助,如想了解更多内容请多多关注我们的网站。
The above is about cold recycling foam asphalt cold recycling machine construction technology, hope to help everyone, if you want to know more content, please pay more attention to our website.
下一篇:冷再生租赁其就地冷再生并不简单 上一篇:路面冷再生机其水泥就地冷再生施工方法
阅读/ Recommended reading
- 冷再生在施工中常见的问题有哪些? 2024-11-06
- 冷再生机租赁:冷再生和热再生的区别是什么? 2024-11-01
- 泡沫沥青冷再生技术施工前的准备 2024-10-26
- 冷再生机租赁:路拌/冷再生机,让你的施工过程始终“开挂” 2024-10-14
冷再生机租赁:道路基层冷再生施工工艺
[2018-08-23]
1.1材料准备 1.1 Material Preparation 在实际的道路基层冷再生施工作业过程中,主要用到的施工材料有沥青面层铣刨料、水泥和水等等。通常大部分施工单...