冷再生施工和机械租赁业务
筑路架桥,奉献社会;以人为本,不断创新

服务热线

18264104888

新闻中心

首页>>新闻中心冷再生机对于城乡建设中的优势展现

冷再生机对于城乡建设中的优势展现

来源:http://www.tclqgc.com/ 日期:2022-01-19 发布人:
1、使用冷再生机施工前要调好水泥浆的稠度并拌合均匀,水泥浆中的杂质和硬块应用滤网滤出,以免堵塞喷嘴;事先调试好喷嘴的喷浆量,以保证水泥剂量准确。
1. Before using the cold regenerator for construction, the consistency of the cement slurry shall be adjusted and mixed evenly. The impurities and hard blocks in the cement slurry shall be filtered out through the filter screen to avoid blocking the nozzle; Adjust the spraying quantity of the nozzle in advance to ensure the accurate cement dosage.
2、开始施工时速度不要太快,为满足设计和质量要求,要经常检查拌合的均匀情况和深度,发现与设计有差异时要及时调整。
2. Do not start construction too fast. In order to meet the design and quality requirements, the uniformity and depth of mixing shall be checked frequently, and timely adjustment shall be made in case of any difference from the design.
3、作业施工水罐车停车时一定要离开已施工或待施工水泥已摊铺路面,以防止漏水引起的局部水大。
3. When the construction water tanker stops, it must leave the paved road of cement that has been constructed or to be constructed, so as to prevent large local water caused by water leakage.
冷再生机租赁
4、施工车辆停放时一定要错开第二天的段道预工作面,以防止耽误第二天的人工水泥摊铺。
4. When parking construction vehicles, the first pre working face of the first section of the next day must be staggered to prevent delaying the artificial cement paving of the next day.
5、避免犯"过压"的错误,即过度压实。若达到材料的大密实度后仍然继续碾压,则会破坏材料,反而降低其密实度。
5. Avoid the mistake of "overpressure", i.e. over compaction. If the rolling is continued after reaching the maximum compactness of the material, the material will be damaged and its compactness will be reduced.
6、冷再生机的施工作业应该在每天下午15:00-16:00之间结束,以便后续施工能在天黑前结束。
6. The construction of cold regenerator shall be completed between 15:00 and 16:00 every afternoon, so that the subsequent construction can be completed before dark.
7、每天冷再生机结束施工进行洗刀停车后,应通知操作手仔细检查车况并更换刀头,以免耽误第二天的施工进度。
7. After the construction of the cold regenerator is finished and the tool is washed and stopped every day, the operator shall be notified to carefully check the vehicle condition and replace the tool head, so as not to delay the construction progress of the next day.
8、冷再生机拌合过程中要经常检查拌合机刀头的磨损情况和水泥浆车的喷嘴,刀头磨损严重要及时更换,喷嘴发生堵塞要及时疏通。
8. During the mixing process of the cold regenerator, the wear of the cutter head of the mixer and the nozzle of the cement slurry truck shall be frequently checked. If the cutter head is seriously worn, it shall be replaced in time, and the nozzle blockage shall be dredged in time.
9、冷再生机拌合时将整个半幅分成3次拌合,用完水泥浆车内已知重量水泥后,核算已经作业的面积与水泥消耗是否相符,及时做出调整。作业结束,放出剩余水泥浆。
9. When mixing with the cold regenerator, divide the whole half into three times. After using up the known weight of cement in the cement slurry truck, check whether the operated area is consistent with the cement consumption, and make adjustment in time. After the operation, release the remaining cement slurry.
以上就是今天小编给大家提供的精彩内容,更多的精彩内容请点击进入我们的网站:冷再生机租赁http://www.tclqgc.com
The above is the wonderful content provided by Xiaobian today. For more wonderful content, please click to enter our official website: cold regenerator rental http://www.tclqgc.com

阅读/ Recommended reading

  1.1材料准备  1.1 Material Preparation  在实际的道路基层冷再生施工作业过程中,主要用到的施工材料有沥青面层铣刨料、水泥和水等等。通常大部分施工单...

冷再生在施工中常见的问题有哪些? 2024-11-06
冷再生机租赁:冷再生和热再生的区别是什么? 2024-11-01
泡沫沥青冷再生技术施工前的准备 2024-10-26
冷再生机租赁:路拌/冷再生机,让你的施工过程始终“开挂” 2024-10-14

产品/ Recommended products