冷再生机组就位后的施工操作

来源:http://www.tclqgc.com/ 日期:2023-06-16 发布人:
对施工路段撒布外加材料,准备冷再生机械设备,包括水车、冷再生机、铣刨机以及沥青罐车。将输油管、输水管进行准确连接。在机械设备连接完成后,对其使用性能进行检查,再进行道路维修施工。
Spread additional materials on the construction section and prepare cold recycling machinery and equipment, including water tankers, cold recycling machines, milling machines, and asphalt tank trucks. Accurately connect the oil and water pipelines. After the mechanical equipment is connected, its performance should be checked before proceeding with road maintenance construction.
冷再生机租赁人员提醒您,当再生机到位后,综合考虑道路工程维修路段的行驶速度要求,对旧路面进行翻松和冷破碎处理,并加入稳定剂进行充分搅拌。
The leasing personnel of the cold recycling machine remind you that when the recycling machine is in place, taking into account the driving speed requirements of the road engineering maintenance section, the old road surface will be scarified and cold crushed, and stabilizer will be added for sufficient mixing.
在路面铣刨以及材料拌和过程中,应同时操作水车和再生机,确保水车处于空档状态,在水带作用下,与再生机进行连接,并对再生机注水,保证拌和所需水资源充足。
During the process of road milling and material mixing, both the water truck and the recycling machine should be operated simultaneously to ensure that the water truck is in neutral position. Under the action of the water hose, it should be connected to the recycling machine and injected with water to ensure sufficient water resources for mixing.
在拌和过程中,再生机应保持匀速、缓慢行进状态,对于再生施工速度,应控制在4~10m/min之间。
During the mixing process, the recycling machine should maintain a constant and slow speed, and the recycling construction speed should be controlled between 4 and 10m/min.
在行驶过程中,禁止突然提速或者减速,同时保证行驶过程匀速和连续性,在施工现场安排专人检查再生机运行状态,对路面维修施工质量进行检查,及时发现问题并进行调整。
During the driving process, it is prohibited to suddenly increase or decrease speed, while ensuring a uniform and continuous driving process. A dedicated person is arranged on the construction site to check the operation status of the regeneration machine, inspect the quality of road maintenance construction, promptly identify problems and make adjustments.
冷再生机租赁
此外在维修段路面横向接缝处理中,加强冷再生机机械设备检查和维修管理,避免在施工过程中出现停机问题。如果发生停机问题,并且停机时间较长,则当再生机重启投入施工过程中,应将所有再生设备退再生施工完成的路段1.5m,然后再重新进行材料撒布和施工。
In addition, the inspection and Computerized maintenance management system of the mechanical equipment of the cold recycling machine should be strengthened in the treatment of the transverse joints of the pavement in the maintenance section to avoid Halting problem during the construction process. If there is a Halting problem problem and the shutdown time is long, when the regenerator is restarted and put into construction, all the regeneration equipment shall be returned to the section 1.5m where the regeneration construction is completed, and then the material spreading and construction shall be carried out again.
在纵向接缝处理中,如果纵向宽度在7m以内,并且纵向重叠部分比较多,则无法进行半幅施工,对此,可采用全幅施工方式,严格控制重叠量,提高施工质量以及施工效率。
In the treatment of longitudinal joints, if the longitudinal width is within 7m and there are many overlapping parts in the longitudinal direction, half width construction cannot be carried out. Therefore, a full width construction method can be adopted to strictly control the overlapping amount, improve construction quality and efficiency.
通常情况下,对于重叠宽度,应控制在50~150mm之间,而如果相邻两次作业间隔时间在12h以上,则应适当增加重叠量。
In general, the overlap width should be controlled between 50 and 150mm, and if the interval between adjacent operations is more than 12 hours, the overlap amount should be appropriately increased.
在调头处处理时,应确保机械设备处于已碾压完成的路面,然后再调头,并加强调头作业段保护管理。对于需调头的8~10m稳定层上,应采用油毡纸或者塑料布进行覆盖,然后再铺厚度为10cm的土,后调头并清理。还有什么事项就来我们网站http://www.tclqgc.com咨询吧!
When handling at the turning point, it is necessary to ensure that the mechanical equipment is on the compacted road surface before turning around and strengthen the protection and management of the turning operation section. For the 8-10m stable layer to be turned around, linoleum paper or plastic cloth shall be used to cover it, and then 10cm thick soil shall be paved, turned around and cleaned. If there are any other matters, please come to our website http://www.tclqgc.com Consult!

阅读/ Recommended reading

施工项目中,选择合适的冷再生机出租服务对于保证工程质量和进度关重要。本文将提供一些关键因素,帮助施工单位做出明智的选择。Choosing the appropriate ren...

如何选择冷再生机出租服务 2024-12-16
冷再生机出租:道路施工的新选择 2024-12-11
冷再生机租赁在土壤稳定中的应用与优势 2024-12-09
全深式就地冷再生施工中的机械设施设备应用 2024-12-05

产品/ Recommended products